:Project subject
Ehya Sepahan steel concentrate production factories with a capacity of 2.3 million tons per year, located in Sangan area of Khaf city of Razavi Khorasan province on a land area of 66 hectares with a construction infrastructure of 13000 square meters, including:
Phase 1 has a concentrate production capacity of 700,000 tons per year
Phase 2 has a concentrate production capacity of 500,000 tons per year
Phase 3 has a concentrate production capacity of 500,000 tons per year
Phase 4 has a concentrate production capacity of 500,000 tons per year
Filtration unit with a capacity of 100 tons per hour
By-product crushing and dewatering unit with a capacity of 100,000 tons of steel by-products or 150,000 tons
Product warehouse with an area of 7000 square meters and a capacity of 50 thousand tons
The transfer system, its storage, and the output of the product from the warehouse and loading by truck and rail (wagon) with a capacity of 1000 tons per hour
Halls of the central repair shop and construction workshop with an area of 2400 square meters
The weight of installed equipment is 3,800 tons
Location: Khaf city, Sangan
Client: Ehya Sepahan Iron Co.
Consultant: Amatis Robin consulting engineers