    The executive operation of the construction of the second phase of dewatering and waste filtration (water recovery project) and all the adjacent buildings with an area of 10,000 square meters include:
    -Construction of structure and concrete tank and pump house for return water
    – Construction of filtration unit, side structures and compressor room
    – Construction of electrical and control room and material transfer system
    – Construction of steel structure and installation of rim
    – Preparation and construction of two lined steel tanks etc…

    Client: Sanabad comprehensive development industrial and mining company

    Consultant: Amatis Rabin Consulting Engineers Company

    Location: Sangan